Project Quality plan is an essential document that any contractor or consultant must have. It is the life line of a project that will ensure the end product that is going to be delivered to client meet all the requirement and specifications. Some how, most of contractor does not have any idea on how to come out with this Project Quality Plan. Below is the the guideline on what shall be include in the Project Quality Plan. In other words, Project Quality Plan contents.
1. INTRODUCTION.
1. INTRODUCTION.
1.1 Contract Particulars
1.2 Project Description
1.3 Site Plan
1.4 Master Work Program
2.0 PROJECT MANAGEMENT ORGANIZATION
2.1 Project Team
2.1.1 Project Team Organization Chart
2.1.2 Roles and Responsibilities
2.2 Quality Assurance and Quality Control Team (QA/QC)
2.2.1 QA/QC Team Organization Chart
2.2.2 Roles and Responsibilities
2.3 Manpower And Machineries on Site
2.3.1 List of Manpower
2.3.2 List of Machineries
3.0 DOCUMENT AND DATA CONTROL
3.1 Project Files
3.2 Incoming Project Files
3.3 Outgoing Project Files
3.4 Distribution / Control of Drawings
4.0 QA/QC ON CONSTRUCTION PROCEDURES
4.1 Method Statement
4.2 Laboratory Testing
4.3 Submission and Approval of Materials
4.4 Handling, Storage And Delivery
4.5 Machinery And Equipment Controls
4.6 Inspection And Test
4.7 Non-Conforming Works And Actions To Be Taken
5.0 QA/QC IMPLEMENTATION PLAN
5.1 Standard Forms and Checklist
5.2 QA/QC Monthly Report
5.3 Inspection And Test Plan
5.4 QA/QC Records
5.5 QA/QC Audits.
1.2 Project Description
1.3 Site Plan
1.4 Master Work Program
2.0 PROJECT MANAGEMENT ORGANIZATION
2.1 Project Team
2.1.1 Project Team Organization Chart
2.1.2 Roles and Responsibilities
2.2 Quality Assurance and Quality Control Team (QA/QC)
2.2.1 QA/QC Team Organization Chart
2.2.2 Roles and Responsibilities
2.3 Manpower And Machineries on Site
2.3.1 List of Manpower
2.3.2 List of Machineries
3.0 DOCUMENT AND DATA CONTROL
3.1 Project Files
3.2 Incoming Project Files
3.3 Outgoing Project Files
3.4 Distribution / Control of Drawings
4.0 QA/QC ON CONSTRUCTION PROCEDURES
4.1 Method Statement
4.2 Laboratory Testing
4.3 Submission and Approval of Materials
4.4 Handling, Storage And Delivery
4.5 Machinery And Equipment Controls
4.6 Inspection And Test
4.7 Non-Conforming Works And Actions To Be Taken
5.0 QA/QC IMPLEMENTATION PLAN
5.1 Standard Forms and Checklist
5.2 QA/QC Monthly Report
5.3 Inspection And Test Plan
5.4 QA/QC Records
5.5 QA/QC Audits.