Everything on construction,Roadworks,civil engineering,earthworks,Building works, engineering,manager, money, quality, software,health,safety,management,tender,method,Environment
Monday, December 27, 2010
Sunday, December 26, 2010
MATERIAL APPROVAL LOG FORM
**NOTE :...THE SAMPLE OF THE FORM ABOVE IS NOT TAKEN FROM THE BOOK OR ANY MATERIAL ADVERTISE HERE. IT IS JUST AND OPTION OR ILLUSTRATION ON HOW THE MATERIAL APPROVAL RECORD CAN BE CAPTURED WHICH IS ANOTHER IMPORTANT COMPONENT ON DOCUMENT RECORDING IN THE CONSTRUCTION INDUSTRY. THE USAGE OF THIS FORM IS STRICTLY AT YOUR OWN RISK. COPYRIGHT OF THE FORM ABOVE IS STRICTLY PROHIBITED.
Wednesday, December 22, 2010
Document control and Correspondance Document Register
Sunday, December 19, 2010
Sunday, December 5, 2010
"I am the boss, because of that I am the one that know everything in my field...I dont have to learn from anyone else..." This phrase is a pitfall for everybody that always think that they are master in their field. However as times goes on, things are continously change. They way it works..eg. years back construction industries rely heavily in the usage of menpower.. nowadays, slowly the role of men being replace by machineries, sortwares even the building component now can be readily purchase from the manufacturer and installed on site. This is what we call transformation of the construction industries.
Because of this we need to be prerare ourselves by reading books, attending talks, convention, courses and so many more. If as the owner you do not have much time to do all this...one of the ways is invest in your readily aviable staff that will later on pass the knowledge to the other staff in you office. Don be to stingy...cause you can afford to lose in a long run.
If you don't have time in the day...why not learning through books that are related to you field.
Saturday, December 4, 2010
CONSTRUCTION WORK PROGRAMME ( SAMPLE )
SAMPLE OF WORK PROGRAMME
Apart from Microsoft Project the Primavera software also can be utilised for proper work scheduling. Scheduling is a compulsory stage in construction industry which all contractors, consultants and owner of the project must not take it for granted. without a proper work programme, the chances for the project to incurred a lost is very high.
Related Article:
Work program by Microsoft project 2010: step by step guide
Construction: Tracking contractual and technical requirement.
Making Money or losing it.
Top secret of successful construction project
Quality Documentation Filing
Request for information
Site Diary
TENDER( PREBIDDING PLANING)
Figure 1
Stage 1: Pretender / prebidding Planning or Management
Tender which usually being advertised through electronic medium or convention medium that is through news paper are among the main medium for client to notify contractor on any tender. Invited tender somehow the notice of tender or invitation to tender normarly being mailed to contractor by the parties who call for the tender. This type of tender usually call invited tender.
Tender duration for the submission by the contractor are heavily depend on the followings:-
- Type of tender: Conventional, Design and build or invited tender.
- Size or value of project .(Value of project most of the time is confidential by the party who call for tender .In Malaysia scenario the value of project will determine the category of contractor that can participate in the tender.
- Amount of information that needs to be disclosing by the tenderers.
In normal practice, the duration of the tendering process for Design and Build tender is from four (4) weeks to 3 months and usually it being break into two (2) stages which are prequalification stage and tender stage. The information that needs to be submitted during the tendering stage is the background of the contractor such as
- financial background
- current project
- previous experience
- registration as required under the condition of prequalification
- Plant, machineries or equipment of the contractor
- Professional (qualified technical and administration) staff of the contractor.
After screening by the party who call for tender, the contractor who pass the requirement of the prequalification will be notify and they are required to submit a complete tender document. This process is call prebidding stage or tender stage. At this stage, contractor will start to engage the following professional;
- Design team to do the design for them.
- Professional Architect
- Professional Civil Engineer
- Professional Structure Engineer
- Professional Project Manager Consultant
- Professional Mechanical Engineer
- Professional Electrical Engineer and
- Professional Quantity Surveyor
The design team then will come out with the tender drawing or plan that will be submitted together with the tender document. The role of the project manager is to come out with the proposed work program with the help of all parties to feed him the relevant data in order for him to develop an almost accurate work program which then resulted to the duration of construction period that is needed to accomplish to work.
Where as, for the Professional Quantity Surveyor will work on the builder cost inclusive of all preliminaries and generally item which then will be compiled to form a complete tender document.
As for Conventional tender contractor will only have to submit their pricing and background information. The background information is the same as the Design and Build prequalification stage.
Under the pretender planing or management, In general, it will involve the following stage;
- Decision to participate in tender
- Purchase of tender document
- Pre tender meeting
- Construction method
- Cost Estimate stage
- Pretender work program
- Decision on overall tender pricing to be submitted and
- Submission of the tender document.