MATERIAL APPROVAL LOG FORM
Wednesday, December 22, 2010
Document control and Correspondance Document Register
Sunday, December 19, 2010
Sunday, December 5, 2010
"I am the boss, because of that I am the one that know everything in my field...I dont have to learn from anyone else..." This phrase is a pitfall for everybody that always think that they are master in their field. However as times goes on, things are continously change. They way it works..eg. years back construction industries rely heavily in the usage of menpower.. nowadays, slowly the role of men being replace by machineries, sortwares even the building component now can be readily purchase from the manufacturer and installed on site. This is what we call transformation of the construction industries.
Because of this we need to be prerare ourselves by reading books, attending talks, convention, courses and so many more. If as the owner you do not have much time to do all this...one of the ways is invest in your readily aviable staff that will later on pass the knowledge to the other staff in you office. Don be to stingy...cause you can afford to lose in a long run.
If you don't have time in the day...why not learning through books that are related to you field.
Saturday, December 4, 2010
CONSTRUCTION WORK PROGRAMME ( SAMPLE )
Apart from Microsoft Project the Primavera software also can be utilised for proper work scheduling. Scheduling is a compulsory stage in construction industry which all contractors, consultants and owner of the project must not take it for granted. without a proper work programme, the chances for the project to incurred a lost is very high.
Related Article:
Work program by Microsoft project 2010: step by step guide
Construction: Tracking contractual and technical requirement.
Making Money or losing it.
Top secret of successful construction project
Quality Documentation Filing
Request for information
Site Diary
TENDER( PREBIDDING PLANING)
Tender duration for the submission by the contractor are heavily depend on the followings:-
- Type of tender: Conventional, Design and build or invited tender.
- Size or value of project .(Value of project most of the time is confidential by the party who call for tender .In Malaysia scenario the value of project will determine the category of contractor that can participate in the tender.
- Amount of information that needs to be disclosing by the tenderers.
- financial background
- current project
- previous experience
- registration as required under the condition of prequalification
- Plant, machineries or equipment of the contractor
- Professional (qualified technical and administration) staff of the contractor.
- Design team to do the design for them.
- Professional Architect
- Professional Civil Engineer
- Professional Structure Engineer
- Professional Project Manager Consultant
- Professional Mechanical Engineer
- Professional Electrical Engineer and
- Professional Quantity Surveyor
- Decision to participate in tender
- Purchase of tender document
- Pre tender meeting
- Construction method
- Cost Estimate stage
- Pretender work program
- Decision on overall tender pricing to be submitted and
- Submission of the tender document.
Monday, July 26, 2010
Photo of building work
Plastering Work Building Underconstruction
Building Underconstruction Falsework for beam & Slab
Special Cement for Plastering Stiffener
Red Clay brick & Stiffener Cutting to Required size for Damp Proof Course
( ECOGUMP)
Tuesday, June 8, 2010
How to Bid and Win Any Tender
1. Follow exactly whatever that are written in the " Instruction to Tenderer " Section.
2. Never use "blanco" or " liquid Paper" if you make any mistake in filling in the Form. Only Strike of the mistake, initial and stamp with company stamp.
3. Write in Capital Letter.
4. Make sure that you have at least 1/3 of financial capacity against your tender value.
5. Never try to be in the rank of lowest tenderer in term of the value of the tender you offer.
6. Try to include only the related construction experience.( The same or almost the same nature of scope of work and value of work.
With this set of rules, I wish all of you the best wishes in you tender bidding.
Sunday, April 18, 2010
REQUEST FOR INFORMATION FORM.
Project Title : Contract No.: | |||
Client : | Consultant : | Contractor : | |
REQUEST FOR INFORMATION FORM | REF. NO.: RFI/ | ||
Signature:…………………….……… Request date :…………………... From :…………………..…………….. Designation :………………………….. To :…………………………………… Attention :……………………………. | |||
Information requested by: *Client / Consultant / client. (*strike whichever not applicable) …………………………………………………………………………………………….…………………… ……………………………………………………………………………………………………….………… ……………………………………………………………………………………………………….………… ……………………………………………………………………………………………….………………… ………………………………………………………………………………………………….……………… ………………………………………………………………………………………………….……………… ………………………………………………………………………………………………….……………… ………………………………………………………………………………………………….……………… | |||
Reply by .: *Client / Consultant / client. (*strike whichever not applicable) …………………………………………………………………………………………….…………………… ……………………………………………………………………………………………………….………… ……………………………………………………………………………………………………….………… ……………………………………………………………………………………………….………………… ………………………………………………………………………………………………….……………… ………………………………………………………………………………………………….……………… ………………………………………………………………………………………………….……………… ………………………………………………………………………………………………….……………… Reply by : Signature:………………………… Name :…………………………… Designation:……………………... Date :…………………………….. | |||
Copy to :
Related topic: RFI (request for inspection) Sample Request for inspection form 2012 Request for inspection |
Tuesday, April 6, 2010
Construction management
Managing the construction site.
Good practice of the construction management of the construction site is always the key to a successful construction project. To have a proper construction management of the site, it always falls back to the basic, that is the CHECKLIST. Among the item that need continuous monitoring and tracking are as bellow.
- Machineries
- Plant
- Equipment
- Labour or manpower
- Health and safety aspect such as Personal protective Equipment (PPE)
- Procurement of the material, machinery, man power, plant
- Quality assurance & Quality control checklist for every aspect of work.
- Method statement Checklist
- Approval of material Checklist.
Some of the common checklist form is as follows.
Contract No :
CONS2U/BLOG/2010
Project Title : Construction of 3 unit of 4 storey Residential Apartment.
Checklist of Machinery/Plant/Equipment/Manpower.
item | Type of machinery | Locations where machine will be deploy. | Machine capacity | QTY | Date Start | Duration | |||
1 | excavator | External drainage | 0.5 cu.m | 1 | 21.04.2006 | 14 days | |||
2 | Dump truck | External drainage | 3 tons | 1 | 21.04.2006 | 14 days | |||
Tuesday, February 16, 2010
Financial Tips and Tricks.
Have You ever heard of the phrase " Other People Money (OPM)". I guest you do. May be more than I know. However it is good to recall back on what we already knew.
In construction industry OPM is a good strategy to be utilised. This is because in this field it will definitely be a very large amount of financial commitment involved. How do we applied this OPM?
Let we check this following List of resources needed in construction.
- Supplier of construction material,
- Supplier of construction Machineries,
- Supplier for the transportation,
- Performance bond or bank guarantee,
- Insurance,
- Labour force or Manpower.
If we look into the list above , can it be outsource or not? Definitely it can. How does we relate this Into OPM. Bear in Mind all of the area mentioned above involving money which for sure you need to pay. However if you can get an excellent outcome of you negotiation on terms and condition of payment, you can invest you available cash into something that can guarantee you of you return which can be utilised to pay those six item listed above. MAKE SURE THAT YOU CAN GET YOUR RETURN NOT MORE THAN 3 MONTHS!.
Usually you will receive your payment for claim the fastest is within one month and it can be dragging for more than that. Hence to be fair to the parties involved try to close you credit term not less than 3 month or 90days period. Meaning that you need to pay after that particular period. Beware most of the supplier will only give 30 days credit term !
The most easier way to the OPM is Project Financing by the bank. If you are sure of your option , than I wish all managers, Developer and contractor good luck.