Site management is a very important
field that shall not be neglected by any contractor. Armed your project with proper
site management personnel which will help contractor to ensure a smooth work flow
environment and in return will help in the success of a project.
Site management is inclusive of
1. Site safety
2. Work place arrangement eg:
site access road, storage and machinery yard and site office.
3. Site personnel
4. Sequence of works
5. Documentation
Each of the listed area above,
need to be properly address and plan in order to make the site management that is
going to be implement will achieve its objective.
A construction site that was operated
without a well-planned site management always resulted as an unsafe site. For example,
a site without proper site management, we can see construction waste is everywhere
and this will pose a great danger. If accident happened, there will be lost in working
hours and this lost is equal to lost in productivity which can be translate to money.
As we already know the important
of site management in construction, now the question is how to put it into practice?
The key to a good site management is to develop the site management plan or guideline.
The content of this site management plan shall consist of all of the listed above.
Personnel need to be appointed and their authority and responsibility clearly mentioned.
layout of the site shall also be include to show the planned location of any important
machinery yard, office, store or even where a heavy machinery shall be station during
construction to ensure smooth activity.
There is some more parameter that
can be included and it depends on the type of construction. If one cannot develop
your site management plan it can always be out source by engaging professional.
Part of site management is
the arrangement of site. The picture below can explained what site arrangement
is.